Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

Product Details
Customization: Available
After-sales Service: Video or Technical Support
Warranty: 1.5
Still deciding? Get samples of $ !
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Self-branded
The supplier has 6 Self-brands, check the Audit Report for more information
Overseas Services
The supplier provides overseas services and supports countries including Denmark, Colombia, India, Georgia.

Overseas service content includes Debugging, Maintain, Repair, Training, Equipment Installation.
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
CCC
to see all verified strength labels (30)
  • Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
  • Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
  • Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
  • Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
  • Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
  • Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Find Similar Products
  • Overview
  • Installation Instructions
  • Product Parameters
  • Detailed Photos
  • Our Advantages
Overview

Basic Info.

Model NO.
CCG 5.0/600J
Customized
Customized
Application
Train Engine
Motive Power
Diesel
Model
Ccg 5.0/600j (B)
Matched Power Model
Yh1125sfb
Dimension (L*W*H) mm
3020*1000(1098)*1600
Weight Kg
5000
Greatest Traction Force Kn
7.5
Pulling Tonnage T
22
Gauge mm
600
Wheelbase mm
880(860)
Greatest Speed Km/H
17+1
Smallest Railway Orbit M
6
Transport Package
Carton Box, Plastic Bagsor as Your Payment
Specification
CE, SGS
Trademark
CHINACOAL
Origin
China
Production Capacity
1000 Sets Per Month

Packaging & Delivery

Package Size
70.00cm * 70.00cm * 70.00cm
Package Gross Weight
59.000kg

Product Description


Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Installation Instructions

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Introduction of Factory High Quality Underground CCG Mining Explosion-Proof Diesel Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

Mining electric locomotive is a transportation tool used in underground mines, which is driven by electricity and has the characteristics of environmental protection, efficiency, and safety.
Mining electric locomotive is a kind of Electric motorcycles and scooters specially used for mine work, which is mainly used to transport ore, coal and other materials. 
It is driven by electricity and has advantages such as environmental protection, high efficiency, and low noise, which can effectively improve the efficiency and safety of mining transportation.zmwm21

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

 
Product Parameters

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Parameters of  Factory High Quality Underground CCG Mining Explosion-Proof Diesel Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

Mining Diesel Locomotive

Model CCG 3.0/600J (B) CCG 5.0/600J (B) CCG-5.0/600 double cylinder explosion-proof diesel locomotive CCG8.0/600J
Matched Power Model ZS1115FB YH1125SFB / YH4108DFB(A)
Dimension (L*W*H) mm 2400*920(1000)*1600 3020*1000(1098)*1600 3500*1100*1580 3700*1100*1600
Weight kg 3000 5000 5000 8000
Greatest Traction
Force KN
4.5 7.5 12 12
Fuel tank (L*W*H mm) / / 320*280*180 /
Pulling Tonnage T 15 22 40 35
Gauge mm 600(made to order)
Wheelbase mm 706(712) 880(860) 900 980
Greatest Speed km/h 15+1 17+1 no-load:forward:14.6   backward:12.5;
rated load:forward:11.6   backward:10
20+2
Diesel Engine Power (kw)/Rotating Speed (r/min) 11/2200 14.7/2200 17.24/2200 52/2400
Smallest Railway Orbit m 5 6 7 7
Greatest Braking Force N 5000 8000   12800
Traction Height mm 270 320 320 430 270  320 430 320 430
Braking Distance m 40
Height Above Ground mm 80 125 / 125
Braking Mode foot and machine control / air and hand wheel control
Exhaust Quality CO≤0.1% NOX≤0.08%

Mining Battery Locomotive

Model CTY2.5/6,7,9G CTY5/6,7,9G CTY8/6,7,9G(B) CTY(L)12/6, 7, 9G CTY18/6,7,9G(B) CTY18/6,7,9G(B)
Self Weight(t) 2.5 5 8 12 15 18
Track Gauge(mm) 600, 762 or 900 600,762 or 900 600,762,900 600, 762 or 900 600,760 or 900 600,762 or 900
Traction(kN) 2.55 7.06 11.18 12.83 16.48 18.47 29.4
Ma* Speed(km/h) 4.54 7 6.2 7.8 8.7 9.6 9.8
Ma*. Traction(kN) 6.13 12.26 19.62 29.43 36.18 44.15
Power Supply Device Voltage(V) 48 90 110,132 140,144 192 256 208
Capacity(Ah) 308 or 330 385 440 560 620 730
Power(kW) 3.5kW*1 7.5kW *2 11kW*2 15kW*2 22kW*1 30Kw * 2 45Kw * 2
Size Length(mm) 2330 2850 44,704,490 5100 5200 5100
Width(mm) 914,1076 or 1212 920,1082/1220 1062/1190/1212/1350 1050, 1212 or 1350 1500 1500
Height(mm) 1550 1550 1600 1600 1920 1900
Traction Height(mm) 320 / / / / / /
Wheelbase(mm) 650 850 1100 1150 1220 1400 2100
Wheel Diameter(mm) Φ460 Φ520 Φ680  Φ600,Φ680 Φ680 Φ680 Φ600
Min. Turning Radius(m) 5 6 7 10 15 20
Controller Resistance or Pulsing speed regulation Resistance or Chopped wave Resistance,IGBT or Frequency conversion Resistance, IGBT or AC Converter Resistance, IGBT or AC Converter Frequency conversion or chopper speed regulation
Brake Mode Mechanical Mechanism or hydraulic pressure Mechanical Mechanical and Pneumatic Brake Mechanical and Pneumatic Brake Mechanical, electrical, air brake

Mining Trolley Locomotive

Specification/ Model CJY7/6GP CJY7/7GP CJY7/9GP CJY10/6GP CJY10/7GP CJY14/6GP CJY14/7GP CJY14/9GP
weight (ton) 7 7 7 10 10 14 14 14
Track gauge (mm) 600 762 900 600 762 600 762 900
Wheelbase (mm) 1100 1100 1100 1100 1100 1700 1700 1700
Wheel diameter (mm) 680 680 680 680 680 680 680 680
Height btw connector & track surface (mm) 320/430 320/430 320/430 320/430 320/430 320/430 320/430 320/430
Min curve radius (m) 7 7 7 7 7 15 15 15
Pantograph (mm) 1800-2200 1800-2200 1800-2200 1800-2200 1800-2200 1800-2400 1800-2400 1800-2400
Braking mode Mechanic + electric Mechanic + electric Mechanic + electric Mechanical+
Electrical
Mechanical+
Electrical
Mechanic + electric+
Air
Mechanical+
Electrical+
Air
Mechanical+
Electrical+
Air
Max traction (kN) 19.2 19.2 19.2 27.5 27.5 38.5 38.5 38.5
Max speed (km/h) 20 20 20 20 20 25 25 25
Rated speed (km/h) 10 10 10 10 10 10 10 10
Power of motor (kW) 2 * 22 2 * 22 2 * 22 2*22(30) 2*22(30) 2*37 2*37 2*37
Voltage(V) DC250/550 DC250/550 DC250/550 DC250/550 DC250/550 DC550 DC550 DC550
Driving method spur gear spur gear spur gear spur gear spur gear spur gear spur gear spur gear
Speed adjust AC frequency change AC frequency change AC frequency change AC Frquency Conversion AC Frquency Conversion AC frequency change AC Frquency Conversion AC Frquency Conversion
Controller   Resistance or IGBT Resistance or IGBT Resistance or IGBT Resistance or IGBT Resistance or IGBT Resistance or IGBT Resistance or IGBT
Transmission Single Level Spur Gearing Single Level
Spur Gearing
Single Level
Spur Gearing
Single Level
Spur Gearing
Single Level
Spur Gearing
Dual Bevel Gearing Dual Bevel Gearing Dual Bevel Gearing
Dimension(L*W*H)(mm) 4460 * 1060 * 1590 4400 *1340 *1590 4400 * 1340* 1590 4460*1060*
1590
4460*1340*
1590
5250*1060*
1750
5250*1340*
1750
5300*1340*
1750
Service  & Application Mucking in Mining&Tunneling Mucking in Mining&
Tunneling
Mucking in Mining&
Tunneling
Mucking in Mining&
Tunneling
Mucking in Mining&
Tunneling
Mucking in Mining&
Tunneling
Mucking in Mining&
Tunneling
Mucking in Mining&
Tunneling
 
Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Detailed Photos

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Photos of 
 Factory High Quality Underground CCG Mining Explosion-Proof Diesel Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives
Our Advantages

Factory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery LocomotivesFactory High Quality Underground Mining Explosion-Proof Diesel Trolley Locomotive Ore Coal Mine Tunnel Electric Battery Locomotives

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
People who viewed this also viewed